Fulfillment architecture

Possible fulfillment paths after procurement.

Status
Explanatory
Version
1.1
Canonical source
Foundational Paper v1.1 §7.3
License
CC BY 4.0

After procurement, the product may:

  • move through a platform-controlled facility;
  • move through a logistics partner’s facility;
  • be consolidated with other products;
  • be inspected, repacked, or relabeled where applicable; or
  • in an appropriate implementation, be shipped from a supplier-controlled location.

These are optional operational paths. The model is not defined by mandatory possession of a warehouse or by mandatory supplier-direct shipment.

Foundational Paper v1.1, §7.3 (Fulfillment paths) · DOI 10.5281/zenodo.22978759

Responsibility for the customer-facing flow: Business architecture. Comparison with dropshipping: Business Model Comparison.

Cite this page

Cite this page
PRISM Commerce Initiative. “Fulfillment architecture.” https://prismcommerce.org/en/architecture/fulfillment/. Based on Pobezhimov, A., PRISM Commerce — Canonical Specification, Version 1.1, https://doi.org/10.5281/zenodo.22978762.

Report a text issue

Submitting sends the passage, up to 80 surrounding characters on each side, the page link and version details, plus any comment and email you add, to Andrei Pobezhimov for review. Our infrastructure provider supports technical processing. The comment and email are optional. Selecting or copying alone sends nothing. Privacy.

Page: